Scope of Work : Supply, Installation, Testing & Commissioning -MPO (Multi-fiber Push-On) /Supply ,Installationof Patch Cords
The scope of work includes the supply, installation, testing, and commissioning of the CommScope Structured Cabling System for the ELM– Laysen Valley project. Activities involve installation of MPO (Multi-Fiber Push-On) cables, fiber patch cords, and related passive components to ensure high-speed connectivity.
Testing includes continuity, attenuation, and performance verification of all links. Proper labeling, documentation, and system integration with the client’s network infrastructure are performed. The project concludes with submission of test reports and final handover of a fully functional structured cabling system.